Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.

Assessment item 3

Draft Design – Detailed PMP

Value: 25%

Due date: 12-Sep-2016

Return date: 06-Oct-2016

Submission method options

Alternative submission method

Task

Network Engineering / Systems administration

Solution Design Document (Draft) and Test Plan

 

The purpose of a Solution Design Document is to provide a thorough and complete description of your proposed solution.

It has to include the logical (network topology, addressing, naming, VLANs, VPNs etc) as well as the physical design (which equipment to use, chosen LAN and WAN technology etc) for solution and provide information on how the design is to be implemented (Installation plans, user guides, administration plans etc). The design decisions that you have made need to be justified by referring back to the customer requirements set out in the Requirements Specification. You will need to show how your proposed design is a valid solution to fulfill these requirements. An electronic copy of the templates for the Design Document can be found in the resources section of the ITC306 Interact site.

 

Test plan

 

The purpose of a test plan is to clearly document the testing parameters for the system you are building in order to ensure the system is accurately evaluated against the system requirements documented in Assessment Item 2.

 

 

IT Management /Business Analysis

 

You are required to submit:

 

Detailed Project Management Plan

 

An Updated detailed Project Management Plan that includes:

Quality Management plan

High level WBS and budget

Change Control plan

 

Reporting Templates

 

Templates for your team submissions including:

Change request forms

Change log,

Issue log,

Team meeting agenda and minutes

other templates as identified

 

Rationale

Network Engineering / Systems administration

  • Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.

IT Management /Business Analysis

  • Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.
Type of paper Academic level Subject area
Number of pages Paper urgency Cost per page:
 Total: